BillMate is bill of quantities software for quantity surveyors, cost consultants and contractors. Take off from the drawings, build unit rates you can defend, price from your own rate library and issue a client-ready BOQ — on your own device, with or without a connection, in the measurement standard your market uses.
See what it does Every demo film View a sample BOQ Plans and regional pricing
| Item | Description | Unit | Qty | Rate |
|---|---|---|---|---|
| 1.01 | Excavate to reduce levels, not exceeding 2.00 m deep; load, cart away and dispose off site | m³ | 420.00 | $18.50 |
| 1.02 | Plain concrete grade 15 blinding, 50 mm thick, to receive foundations | m² | 640.00 | $9.40 |
| 1.03 | Reinforced concrete grade 30 in isolated pad and strip foundations | m³ | 96.00 | $141.83 |
| 1.04 | High-yield steel reinforcement, cut, bent and fixed in position | t | 7.20 | $1,320 |
| 1.05 | Sawn formwork to vertical sides of foundations, height not exceeding 1.00 m | m² | 210.00 | $31.50 |
| 1.06 | Provisional sum for ground-improvement works, to be expended as directed | sum | 1 | $65,000 |
It covers the work between a set of dimensions and a document you can hand to a client: the taking-off, the pricing, the library your rates come from, and the printed bill.
A traditional dimension sheet — timesing, deductions, squaring — kept behind every bill item rather than thrown away once the quantity is typed.
The taking-off sheet 02Material, labour, plant, waste, overheads and profit, itemised — so when a client questions a rate you can open it and answer.
How rates are built 03Import the schedule you already keep in a spreadsheet, price a whole bill from it, and uplift the lot when the year turns.
The rate library 04Paginated, letterheaded, collected and carried forward — with a basis-of-estimate note that says where each rate came from.
See a finished BOQOpen a floor plan as a DXF, or as the PDF the architect exported from CAD, and BillMate reads the wall lines, the door and window blocks and the rooms. It drafts the blockwork, the doors and windows, and the floor, wall and ceiling finishes — each one as a dimension sheet you can open, not a bare number.
A draft to check, not a finished bill. It covers masonry, openings and finishes only: foundations, frame, roof, stairs and services are still yours to measure. Scanned or photographed drawings have no lines to read. Paid feature, labelled Beta. How it works.
BillMate keeps every project, every dimension and every rate in storage on the machine in front of you. There is no account to sign into and nothing to sync before you can start work. Turn on sync and your devices stay in step, encrypted with a passphrase only you hold.
The other side of that. If the device is lost, the projects are lost with it. BillMate reminds you to back up after 14 days. How backups work.
A quantity typed straight into a bill is a number nobody can check. A quantity cast from a dimension sheet carries its own working.
| Times | Dimensions | Squaring | Description |
|---|---|---|---|
| 32.40 0.60 1.20 |
23.33 | Excavate trench, external walls. Centre-line girth 32.40, trench width 0.60, depth 1.20. | |
| 2/ | 7.80 0.60 1.20 |
11.23 | Ditto, the two cross walls. Timesing 2/ because both walls are identical — measured once, multiplied. |
| 9.60 0.60 1.20 |
6.91 | Ditto, the rear return. | |
| 3.50 0.60 1.20 |
2.52 | Deduct — trench through the existing apron slab, which is measured separately. | |
| Cast into the bill | 38.95 | m³ | |
Worked example, illustrative dimensions. Timesing multiplies a repeated measurement; a deduction subtracts. The squared column is calculated for you, and the total is what appears in the bill — the full walkthrough is here.
Constituent by constituent, with waste and productivity visible and the percentage additions applied where you can see them.
| Constituent | Quantity | Unit | Cost | Amount |
|---|---|---|---|---|
| Material Ready-mixed concrete grade 30, delivered — including 4% waste | 1.04 | m³ | $78 | $81.12 |
| Material Curing compound and protection allowance | 1.00 | item | $2.40 | $2.40 |
| Labour Gang — place, compact and finish | 1.20 | hr | $22 | $26.40 |
| Plant Poker vibrator — hire and fuel | 0.40 | hr | $5.50 | $2.20 |
| Net cost | $112.12 | |||
| Overheads and establishment charges, 10% | $11.21 | |||
| Profit and risk, 15% on net cost plus overheads | $18.50 | |||
| Unit rate per m³ | $141.83 | |||
Illustrative constituent costs — replace them with your own. The 10% and 15% additions are BillMate's defaults and are yours to change. The same item batched on site rather than delivered is a structurally different rate: here it is in naira, and here it is in sterling.
A bill is priced in cubic metres and square metres. Site is supplied in bags, blocks, tonnes and days. Every rate you build from resource prices already says how much of each one a unit takes, so BillMate multiplies it out over the whole bill: materials to order, labour in hours and man-days, plant time, and what each costs.
| Resource | Quantity | Unit | Hours | Man-days | Cost |
|---|---|---|---|---|---|
| Material Ready-mixed concrete grade 30, delivered | 99.84 | m³ | $7,787.52 | ||
| Material Hollow block 440 × 215 × 200 mm | 4,410 | nr | $4,851.00 | ||
| Material Cement mortar 1:4 | 8.4 | m³ | $798.00 | ||
| Material Curing compound and protection allowance | 96 | item | $230.40 | ||
| Materials subtotal | $13,666.92 | ||||
| Labour Mason | 315 | hr | 315 | 39.38 | $7,560.00 |
| Labour Labourer | 315 | hr | 315 | 39.38 | $4,410.00 |
| Labour Gang | 115.2 | hr | 115.2 | 14.4 | $2,534.40 |
| Labour subtotal | 745.2 | 93.15 | $14,504.40 | ||
| Plant Poker vibrator | 38.4 | hr | 38.4 | 4.8 | $211.20 |
| Plant subtotal | 38.4 | 4.8 | $211.20 | ||
| Total of resources | $28,382.52 | ||||
Illustrative figures, from the build-up above and a blockwork build-up beside it. Set your own working day and the man-days follow. Labour cost ties back to the bill: the gang’s 115.2 hours at $22 are the $26.40 of labour in each of the 96 m³.
Free on every plan. Print it, or take it away as an Excel workbook with materials, labour, plant and the items not included on separate sheets. How the schedule works · Blocks, cement, rods and labour days, in naira.
Import what you already have, capture what you price, and let BillMate tell you which rates have gone quiet.
| Description | Unit | Rate | Location | Priced | Source | Status |
|---|---|---|---|---|---|---|
| Excavate to reduce levels, n.e. 2.00 m deep, dispose off site | m³ | $18.50 | Site A — coastal | 2026-06 | Priced tender | Current |
| Reinforced concrete grade 30 in pad and strip foundations | m³ | $141.83 | Site A — coastal | 2026-06 | Own build-up | Current |
| Ditto, same specification | m³ | $167.20 | Site B — remote | 2026-05 | Priced tender | Current |
| High-yield reinforcement, cut, bent and fixed | t | $1,320 | Site A — coastal | 2026-04 | Subcontract quote | Current |
| Sawn formwork to sides of foundations, n.e. 1.00 m high | m² | $31.50 | Site A — coastal | 2024-11 | Priced tender | Stale |
Each rate carries its location, the month it was priced and where it came from. Anything older than 12 months is flagged stale rather than quietly reused. How the library works · Importing a Nigerian schedule.
BillMate can draft a whole bill from a description of the works. It will not pretend that the rates it produced are market evidence.
It is not a quotation, not a market survey and not evidence of a current price in your city. It is a plausible starting figure produced from training data of uncertain age.
Use it to fill a gap while you chase a real price. Do not issue a bill with unverified rates still on it — BillMate prints the count on the document so a client's surveyor can see it too.
A bill prepared to the wrong method of measurement is a bill a client's surveyor cannot read. Pick the standard, and the section structure, terminology and AI instructions follow it.
What each standard covers, and exactly how far BillMate supports it. We publish the gaps as well as the coverage. If you currently prepare bills in a spreadsheet, BillMate compared with Excel is the more useful starting point — it says where Excel is still the better tool as plainly as where it is not.
Every market above has a page of its own, and two of them say plainly that no national method of measurement ships for them — see what "localised" means here.
No subscription, no renewal date and no sales call. Price a real job free, then decide whether issuing it is worth paying for.
2 active projects. Taking-off, rate build-ups and the whole rate library. No sign-up. 2 watermarked exports.
Start 2 projects freeOne authorised user, up to 3 devices. Unlimited projects, client-ready PDF and CSV export, AI assistance, core updates to version 1.x.
Buy Pro — $59Up to 5 authorised users and 10 devices on one shared licence key. Everyone works on their own projects; there is no simultaneous collaborative editing.
Buy Team — $199Prices as at . The two buttons above follow whichever market you have chosen, here or on the pricing page, and they keep following it on every page after. Until you choose one they open the Global products: nothing is picked from your IP address, so where we cannot tell you see the higher price rather than a guess. Free and paid entitlements are listed line by line on the pricing page.
A bill is believed when someone else can follow it. BillMate prints the papers a checking surveyor asks for, on your letterhead, from the same data as the bill: nothing is retyped, and nothing in them can change a quantity or a rate.
Free as well as paid. On the free plan the papers print with the watermark and do not use up an export. How checking documents work.
An illustration of the check sheet’s summary. The figures on yours come from your bill.
You price risk for a living, so here is ours laid out the way you would lay it out: one item per doubt, and what each one costs you.
| Item | The doubt, and the answer | Cost to you |
|---|---|---|
| 0.01 | Do I have to sign up, or give a card, to try it?No. Open it and start measuring. The free plan gives you 2 projects and 2 watermarked exports, with no account and no time limit. | Nil |
| 0.02 | Is this another subscription?No. $59 once, for 3 of your own devices, with no renewal date. The only monthly item is the optional market-rates add-on, and nothing else depends on it. | Nil |
| 0.03 | What if I pay and it does not suit how I work?Ask within 14 days and the payment is refunded, no questions asked. The refund policy. | Nil |
| 0.04 | Will it work where I actually work?Measuring, pricing, printing and exporting need no connection. A licence checks in when it can and keeps working for 30 days with none at all. Only the AI features need the internet. | Nil |
| 0.05 | Who else sees my client’s figures?Nobody. Projects, rates and letterhead stay on your device. Sync, if you turn it on, is encrypted with a passphrase only you hold. | Nil |
| 0.06 | Can I trust its arithmetic?Do not take our word for it: print the arithmetic check, which works every line, section and summary a second time, and the dimension sheets behind every quantity. | Nil |
| 0.07 | Am I locked in?No. The bill leaves as Excel with live formulas, CSV or PDF, and every project and both libraries back up to one file you keep. | Nil |
| 0.08 | Does it measure the way my market does?7 methods of measurement are built in, with 14 currencies and 6 languages. See yours, and what BillMate does not do. | Nil |
| Carried to summary: what it costs to find out | 0.00 | |
Published here rather than buried, because finding out on the job is worse than finding out now.
If your work is led by 3D models rather than drawings, a package built for model take-off is the right tool and BillMate sits behind it. The honest comparison.
Naira pricing, Lagos, Abuja, Port Harcourt and Ibadan examples, a BESMM4 page that tells you exactly what is and is not implemented, and a rate-analysis walkthrough built on Nigerian constituents.
Open the Nigeria hubPrice a real job on the free plan, then decide.
Paid once. No subscription.
Prices for Global Not your region?
Charged in US dollars.